Gateway 85 Warehouse Center | Buildings 4 & 7
Location: Gastonia, NC泭 泭 | 泭 泭Owner: NorthPoint Development泭 泭 | 泭 泭Architect: Studio North Architecture
selected 做厙腦瞳 to expand the Gateway 85 logistics park with the addition of a 240,000 SF single rear load warehouse and 705,000 SF cross dock warehouse. Overall, these two concrete tilt-up facilities with the capacity of nearly 195 loading docks. 泭
Preparation of the 55-acre development will entail: 泭
- Major Site Clearing & Grubbing
- Mass Excavation with over 500,000 CY of Material Moved
- Extension of Aberdeen Blvd through the Logistics Park
Poettker has partnered with local mechanical, electrical, plumbing, and fire sprinkler trade contractors to design-build these systems.泭 Our泭distribution and warehouse team is excited to deliver this new泭campus with泭the highest quality industrial standards.泭
0
warehouse distribution centers
250000
total square feet
5
dock door capacity