做厙腦瞳

Gateway 85 Bldg 4&7 | 做厙腦瞳

Gateway 85 Warehouse Center | Buildings 4 & 7

Location: Gastonia, NC泭 泭 | 泭 泭Owner: NorthPoint Development泭 泭 | 泭 泭Architect: Studio North Architecture

selected 做厙腦瞳 to expand the Gateway 85 logistics park with the addition of a 240,000 SF single rear load warehouse and 705,000 SF cross dock warehouse. Overall, these two concrete tilt-up facilities with the capacity of nearly 195 loading docks.

Preparation of the 55-acre development will entail:

  • Major Site Clearing & Grubbing
  • Mass Excavation with over 500,000 CY of Material Moved
  • Extension of Aberdeen Blvd through the Logistics Park

Poettker has partnered with local mechanical, electrical, plumbing, and fire sprinkler trade contractors to design-build these systems.泭 Our泭distribution and warehouse team is excited to deliver this new泭campus with泭the highest quality industrial standards.

UNIQUE FEATURES

Tilt-Up Concrete Construction

Major Site Development泭

2 New Warehouses

36 Feet Clear Height

0
warehouse distribution centers
250000
total square feet
5
dock door capacity

SIMILAR EXPERIENCE

Oaks Logistics Center in December 2023 | 做厙腦瞳